Galion-Muskingham River 345kV (V2-023)

Galion-Muskingham River 345kV is a 250.5 MW wind interconnection project in Morrow, Ohio with a current status of withdrawn.

250.5 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGalion-Muskingham River 345kV
Queue IDV2-023
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity250.5 MW
StateOhio
CountyMorrow
Point of interconnection
Requested (queue) date2009-06-30
Proposed in-service date2012-12-31
Operational date
Withdrawn date2010-04-07
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.