Galion-Roberts South 138kV is a 150.0 MW solar interconnection project in Marion, Ohio with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGalion-Roberts South 138kV
Queue IDAB2-131
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateOhio
CountyMarion
Point of interconnection
Requested (queue) date2016-04-29
Proposed in-service date2019-06-01
Operational date
Withdrawn date2020-08-29
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.