Galion-South Berwick 345 kV (AG2-149 - moved to TC2)

Galion-South Berwick 345 kV is a 314.0 MW solar interconnection project in Crawford, Ohio with a current status of withdrawn.

314.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameGalion-South Berwick 345 kV
Queue IDAG2-149 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity314.0 MW
StateOhio
CountyCrawford
Point of interconnection—
Requested (queue) date2021-02-22
Proposed in-service date2028-12-31
Operational date—
Withdrawn date2025-11-27
Developer—
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.