Gardiner Substation (L0423)
Gardiner Substation is a 30.0 MW other interconnection project in Douglas, Oregon with a current status of withdrawn. It is proposed to connect at Gardiner 115kV Substation.
30.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Gardiner Substation |
|---|---|
| Queue ID | L0423 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Other |
| Capacity | 30.0 MW |
| State | Oregon |
| County | Douglas |
| Point of interconnection | Gardiner 115kV Substation |
| Requested (queue) date | 2017-11-17 |
| Proposed in-service date | 2020-11-17 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Central Lincoln People's Utility District |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata