Gardiner Substation (L0423)

Gardiner Substation is a 30.0 MW other interconnection project in Douglas, Oregon with a current status of withdrawn. It is proposed to connect at Gardiner 115kV Substation.

30.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameGardiner Substation
Queue IDL0423
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity30.0 MW
StateOregon
CountyDouglas
Point of interconnectionGardiner 115kV Substation
Requested (queue) date2017-11-17
Proposed in-service date2020-11-17
Operational date
Withdrawn date
DeveloperCentral Lincoln People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.