Garnet Mesa 115 Substation (GI-TC-2021-07)

Garnet Mesa 115 Substation is a 80.0 MW solar interconnection project in Delta County, Colorado with a current status of active. It is proposed to connect at Garnet Mesa 115 Substation.

80.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology

Project facts

Canonical nameGarnet Mesa 115 Substation
Queue IDGI-TC-2021-07
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketCO
TechnologySolar
Capacity80.0 MW
StateColorado
CountyDelta County
Point of interconnectionGarnet Mesa 115 Substation
Requested (queue) date2021-03-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata