Garnett Battery Storage (1161)

Garnett Battery Storage is a 20.0 MW battery interconnection project in Cayuga, New York with a current status of withdrawn. It is proposed to connect at Pannel - Clay 345 KV.

20.0 MWCapacity
WithdrawnStatus
BMarket
BatteryTechnology

Project facts

Canonical nameGarnett Battery Storage
Queue ID1161
Statuswithdrawn
Source status0
MarketB
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyCayuga
Point of interconnectionPannel - Clay 345 KV
Requested (queue) date2021-04-20
Proposed in-service date2022-07-31
Operational date
Withdrawn date
DeveloperGarnet Energy Center, LLC
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.