Gas Turbine Capacity Increase( #157) (184)

Gas Turbine Capacity Increase( #157) is a 140.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at 337 Sandy Pond - Tewksbury 345 kV Line.

140.0 MWCapacity
WithdrawnStatus
CMAMarket
GasTechnology

Project facts

Canonical nameGas Turbine Capacity Increase( #157)
Queue ID184
Statuswithdrawn
Source statusW
MarketCMA
TechnologyGas
Capacity140.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnection337 Sandy Pond - Tewksbury 345 kV Line
Requested (queue) date2006-11-17
Proposed in-service date2008-12-01
Operational date
Withdrawn date2007-05-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata