Gas Turbine Capacity Increase (see #155) (170)

Gas Turbine Capacity Increase (see #155) is a 40.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at NSTAR Mystic Substation.

40.0 MWCapacity
WithdrawnStatus
BOSTMarket
GasTechnology

Project facts

Canonical nameGas Turbine Capacity Increase (see #155)
Queue ID170
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGas
Capacity40.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionNSTAR Mystic Substation
Requested (queue) date2006-08-25
Proposed in-service date2011-05-01
Operational date
Withdrawn date2009-04-09
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata