Gas Turbine Capacity Increase ( See queue position (239)

Gas Turbine Capacity Increase ( See queue position is a 35.0 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at UI 345 kV Singer Substation.

35.0 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameGas Turbine Capacity Increase ( See queue position
Queue ID239
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity35.0 MW
StateConnecticut
CountyFairfield
Point of interconnectionUI 345 kV Singer Substation
Requested (queue) date2007-12-12
Proposed in-service date2010-09-30
Operational date
Withdrawn date2008-10-22
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.