Gas Turbine Capacity Increase ( See queue position (267)

Gas Turbine Capacity Increase ( See queue position is a 175.0 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at 345 kV line # 321.

175.0 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameGas Turbine Capacity Increase ( See queue position
Queue ID267
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity175.0 MW
StateConnecticut
CountyFairfield
Point of interconnection345 kV line # 321
Requested (queue) date2008-06-24
Proposed in-service date2011-06-01
Operational date
Withdrawn date2009-03-09
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata