Gas Turbine Increase (387)

Gas Turbine Increase is a 13.5 MW gas interconnection project in New Haven, Connecticut with a current status of withdrawn. It is proposed to connect at CMEEC 115kV Wallingford Substation.

13.5 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameGas Turbine Increase
Queue ID387
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity13.5 MW
StateConnecticut
CountyNew Haven
Point of interconnectionCMEEC 115kV Wallingford Substation
Requested (queue) date2012-01-13
Proposed in-service date2013-02-28
Operational date
Withdrawn date2013-03-22
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata