Gas Turbine (160)

Gas Turbine is a 82.2 MW gas interconnection project in Middlesex, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P Middletown Substation.

82.2 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology

Project facts

Canonical nameGas Turbine
Queue ID160
Statuswithdrawn
Source statusW
MarketCT
TechnologyGas
Capacity82.2 MW
StateConnecticut
CountyMiddlesex
Point of interconnectionCL&P Middletown Substation
Requested (queue) date2006-06-30
Proposed in-service date2011-05-31
Operational date
Withdrawn date2008-11-26
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata