Gas Turbine (190)

Gas Turbine is a 39.0 MW gas interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P Tunnel 115 kV Substation.

39.0 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology

Project facts

Canonical nameGas Turbine
Queue ID190
Statuswithdrawn
Source statusW
MarketCT
TechnologyGas
Capacity39.0 MW
StateConnecticut
CountyNew London
Point of interconnectionCL&P Tunnel 115 kV Substation
Requested (queue) date2006-12-22
Proposed in-service date2010-01-31
Operational date
Withdrawn date2009-05-07
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata