Gas Turbine (191)

Gas Turbine is a 100.0 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at UI 115 kV line #8909.

100.0 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameGas Turbine
Queue ID191
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity100.0 MW
StateConnecticut
CountyFairfield
Point of interconnectionUI 115 kV line #8909
Requested (queue) date2006-12-22
Proposed in-service date2010-05-31
Operational date
Withdrawn date2007-05-14
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata