Gas Turbine (208)

Gas Turbine is a 100.0 MW gas interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at 345 kV NEA Bellingham substation.

100.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameGas Turbine
Queue ID208
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity100.0 MW
StateMassachusetts
CountyNorfolk
Point of interconnection345 kV NEA Bellingham substation
Requested (queue) date2007-04-13
Proposed in-service date2011-06-01
Operational date
Withdrawn date2008-08-21
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata