Gas Turbine (223)

Gas Turbine is a 159.0 MW gas interconnection project in New Haven, Connecticut with a current status of withdrawn. It is proposed to connect at East Shore-Grand Ave 115 kV line.

159.0 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameGas Turbine
Queue ID223
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity159.0 MW
StateConnecticut
CountyNew Haven
Point of interconnectionEast Shore-Grand Ave 115 kV line
Requested (queue) date2007-07-25
Proposed in-service date2010-05-06
Operational date
Withdrawn date2007-11-07
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata