GATEWAY ENERGY STORAGE 2 (1290)

GATEWAY ENERGY STORAGE 2 is a 201.2 MW battery interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at Otay Mesa substation 230 kV .

201.2 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameGATEWAY ENERGY STORAGE 2
Queue ID1290
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity201.2 MW
StateCalifornia
CountySan Diego
Point of interconnectionOtay Mesa substation 230 kV
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2016-07-22
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.