Gaylord - Atlanta 138.0kV (J3676)

Gaylord - Atlanta 138.0kV is a 93.0 MW solar interconnection project in Otsego, Michigan with a current status of withdrawn. It is proposed to connect at Gaylord - Atlanta 138.0kV.

93.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGaylord - Atlanta 138.0kV
Queue IDJ3676
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity93.0 MW
StateMichigan
CountyOtsego
Point of interconnectionGaylord - Atlanta 138.0kV
Requested (queue) date2024-04-18
Proposed in-service date2027-12-15
Operational date2027-12-15
Withdrawn date2025-12-23
Developer
Utility / transmission ownerWOLVERINE POWER SUPPLY COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.