WOLVERINE POWER SUPPLY COOPERATIVE — Interconnection Queue Projects
WOLVERINE POWER SUPPLY COOPERATIVE is associated with 13 tracked interconnection projects representing 1,888 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
13Projects
0Active
7Operational
6Withdrawn
1,888 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 10 | 1,495 MW |
| Battery | 3 | 393 MW |
Geographic footprint
| State | Projects |
|---|---|
| Michigan | 13 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MURPHY - NELSON ROAD 345.0kV | J3769 | Solar | 250.0 MW | withdrawn | Saginaw, Michigan |
| Lake County - Pere Marquette (METC) 138.0kV | J2668 | Solar | 215.0 MW | operational | Mason, Michigan |
| Rogers 138 kV Substation | J3486 | Battery | 200.0 MW | withdrawn | Muskegon, Michigan |
| Other_ | J2774 | Solar | 200.0 MW | withdrawn | Ionia, Michigan |
| Bradley 138 kV Substation | J2129 | Solar | 150.0 MW | operational | Barry, Michigan |
| Burnips to Tremaine 138 kV line | J2279 | Solar | 150.0 MW | withdrawn | Ionia, Michigan |
| Gaylord Interconnection | J3134 | Solar | 150.0 MW | operational | Otsego, Michigan |
| Lake County - Pere Marquette (METC) 138.0kV | J2669 | Solar | 120.0 MW | operational | Mason, Michigan |
| Hersey Interconnection | J3287 | Solar | 110.0 MW | operational | Osceola, Michigan |
| Mulliken Jct.- Chester 69 kV | J2710 | Solar | 100.0 MW | withdrawn | Clinton, Michigan |
| Clinton Interconnection | J4128 | Battery | 100.0 MW | operational | Eaton, Michigan |
| Gaylord - Atlanta 138.0kV | J3676 | Battery | 93.0 MW | withdrawn | Otsego, Michigan |
| Hersey Interconnection | J3066 | Solar | 50.0 MW | operational | Osceola, Michigan |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-09-24 | Gaylord - Atlanta 138.0kV | phase | Study Not Started | Phase 2 |
| 2026-09-24 | MURPHY - NELSON ROAD 345.0kV | phase | Study Not Started | Phase 2 |
| 2026-09-24 | Hersey Interconnection | phase | Study Not Started | Phase 2 |
| 2026-09-24 | Rogers 138 kV Substation | phase | Study Not Started | Phase 2 |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-10-12
Page data generated2026-10-12
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through WOLVERINE POWER SUPPLY COOPERATIVE.
Start tracking with interXdata