Gaylord Interconnection (J3134)

Gaylord Interconnection is a 150.0 MW solar interconnection project in Otsego, Michigan with a current status of operational. It is proposed to connect at Gaylord Interconnection.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameGaylord Interconnection
Queue IDJ3134
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity150.0 MW
StateMichigan
CountyOtsego
Point of interconnectionGaylord Interconnection
Requested (queue) date2022-09-15
Proposed in-service date2025-06-30
Operational date2025-06-30
Withdrawn date
Developer
Utility / transmission ownerWOLVERINE POWER SUPPLY COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata