Geff is a 21.4 MW solar interconnection project in Wayne, Illinois with a current status of withdrawn. It is proposed to connect at Geff.

21.4 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGeff
Queue IDJ3993
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity21.4 MW
StateIllinois
CountyWayne
Point of interconnectionGeff
Requested (queue) date2025-04-29
Proposed in-service date2027-02-01
Operational date2027-02-01
Withdrawn date2026-04-14
Developer
Utility / transmission ownerHoosier Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata