GEN-2005-002 (GEN-2005-002)

GEN-2005-002 is a 80.0 MW wind interconnection project in Hutchison County, Texas with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameGEN-2005-002
Queue IDGEN-2005-002
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity80.0 MW
StateTexas
CountyHutchison County
Point of interconnection
Requested (queue) date2005-01-18
Proposed in-service date
Operational date
Withdrawn date2006-06-26
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata