GEN-2008-012 (GEN-2008-012)

GEN-2008-012 is a 150.0 MW wind interconnection project in Benton County, Arkansas with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
ARMarket
WindTechnology

Project facts

Canonical nameGEN-2008-012
Queue IDGEN-2008-012
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologyWind
Capacity150.0 MW
StateArkansas
CountyBenton County
Point of interconnection—
Requested (queue) date2008-02-19
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata