GEN-2008-073 (GEN-2008-073)

GEN-2008-073 is a 300.0 MW wind interconnection project in Barber County, Kansas with a current status of withdrawn.

300.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameGEN-2008-073
Queue IDGEN-2008-073
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity300.0 MW
StateKansas
CountyBarber County
Point of interconnection—
Requested (queue) date2008-07-18
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerMKEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.