MKEC — Interconnection Queue Projects
MKEC is associated with 23 tracked interconnection projects representing 3,567 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
23Projects
0Active
5Operational
18Withdrawn
3,567 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 20 | 3,255 MW |
| Gas | 2 | 302 MW |
| Solar | 1 | 10 MW |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| GEN-2008-076 | GEN-2008-076 | Wind | 300.0 MW | withdrawn | Barber County, Kansas |
| GEN-2008-075 | GEN-2008-075 | Wind | 300.0 MW | withdrawn | Barber County, Kansas |
| GEN-2008-073 | GEN-2008-073 | Wind | 300.0 MW | withdrawn | Barber County, Kansas |
| GEN-2008-074 | GEN-2008-074 | Wind | 300.0 MW | withdrawn | Barber County, Kansas |
| Elm Creek 230kV | GEN-2003-006A | Wind | 201.0 MW | operational | Cloud County, Kansas |
| Spearville - Holcomb 345 kV | GEN-2010-054 | Wind | 200.0 MW | withdrawn | Hodgeman County, Kansas |
| GEN-2007-028 | GEN-2007-028 | Wind | 200.0 MW | withdrawn | Cloud, Kansas |
| Thistle 345kV | GEN-2014-049 | Wind | 200.0 MW | withdrawn | Pratt, Kansas |
| Mullergreen 230kV | GEN-2009-010 | Wind | 199.5 MW | withdrawn | Barton County, Kansas |
| Spearville 230kV | GEN-2004-014 | Wind | 152.0 MW | operational | Edwards, Kansas |
| North Judson Large 115kV | GEN-2009-013 | Gas | 151.0 MW | withdrawn | Dodge City, Kansas |
| Mullergren 115kV | GEN-2009-014 | Gas | 151.0 MW | withdrawn | Great Bend, Kansas |
| RV Road 115kV | GEN-2006-022 | Wind | 150.0 MW | withdrawn | Pratt County, Kansas |
| Shooting Star Tap 115kV | GEN-2001-039A | Wind | 104.0 MW | operational | Kiowa County, Kansas |
| Tap GEN-2008-079 - Cudahy 115KV | GEN-2009-059 | Wind | 100.5 MW | withdrawn | Clark County, Kansas |
| Spearville 230kV | GEN-2002-025A | Wind | 100.5 MW | operational | Spearville, Kansas |
| GEN-2008-062 | GEN-2008-062 | Wind | 100.0 MW | withdrawn | Beaver County, Oklahoma |
| Gray County Tap 115kV | GEN-2012-013 | Wind | 99.0 MW | withdrawn | Gray County, Kansas |
| Crooked Creek 115kV | GEN-2008-079 | Wind | 98.9 MW | operational | Gray County, Kansas |
| Tap Plainsville - Phillipsburg 115kV | GEN-2009-011 | Wind | 50.0 MW | withdrawn | Rooks County, Kansas |
| GEN-2007-065 | GEN-2007-065 | Wind | 50.0 MW | withdrawn | Osborne County, Kansas |
| Pratt 115kV | GEN-2010-049 | Wind | 49.6 MW | withdrawn | Pratt County, Kansas |
| GEN-2008-079 115kV | GEN-2011-003 | Solar | 10.0 MW | withdrawn | Gray County, Kansas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through MKEC.