GEN-2008-121 (GEN-2008-121)

GEN-2008-121 is a 149.5 MW wind interconnection project in Motley Co, Texas with a current status of withdrawn.

149.5 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameGEN-2008-121
Queue IDGEN-2008-121
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity149.5 MW
StateTexas
CountyMotley Co
Point of interconnection
Requested (queue) date2008-10-09
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata