GEN-2008-125O is a 80.0 MW wind interconnection project in Burt County, Nebraska with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameGEN-2008-125O
Queue IDGEN-2008-125O
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity80.0 MW
StateNebraska
CountyBurt County
Point of interconnection—
Requested (queue) date2008-12-02
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata