GEN-2016-081 (GEN-2016-081)

GEN-2016-081 is a 300.0 MW wind interconnection project in Yoakum, Texas with a current status of withdrawn.

300.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameGEN-2016-081
Queue IDGEN-2016-081
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity300.0 MW
StateTexas
CountyYoakum
Point of interconnection
Requested (queue) date2016-06-30
Proposed in-service date
Operational date
Withdrawn date2016-08-04
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata