GEN-2019-006 (GEN-2019-006)

GEN-2019-006 is a 100.0 MW solar interconnection project in Spink, South Dakota with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameGEN-2019-006
Queue IDGEN-2019-006
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity100.0 MW
StateSouth Dakota
CountySpink
Point of interconnection
Requested (queue) date2019-04-23
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.