GEN-2021-SR3 (GEN-2021-SR3)

GEN-2021-SR3 is a 23.4 MW solar interconnection project in Oklahoma City, Oklahoma with a current status of withdrawn.

23.4 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameGEN-2021-SR3
Queue IDGEN-2021-SR3
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity23.4 MW
StateOklahoma
CountyOklahoma City
Point of interconnection
Requested (queue) date2021-02-12
Proposed in-service date2022-10-31
Operational date
Withdrawn date2021-09-30
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata