The interXdata warehouse tracks 7 interconnection projects in Oklahoma City, Oklahoma, representing 667 MW of requested capacity.

7Total projects
3Active
0Operational
4Withdrawn
667 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other3360 MW
Battery1183 MW
Gas2101 MW
Solar123 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
138 KV substation at Horeshoe Lake, specifically Horseshoe Lake 7 (OKGEHL7)GEN-2023-SR21Other235.0 MWwithdrawnOklahoma City, Oklahoma
Mustang 138 KV SubstationGEN-2025-SR14Battery183.0 MWactiveOklahoma City, Oklahoma
Mustang 138kV SubstationGEN-2025-SR23Other100.0 MWactiveOklahoma City, Oklahoma
Tinker Air Force Base 138kVGEN-2023-GR2Gas94.2 MWactiveOklahoma City, Oklahoma
138 KV substation at Horeshoe Lake, specifically Horseshoe Lake 8 (OKGEHL8)GEN-2023-SR24Other25.0 MWwithdrawnOklahoma City, Oklahoma
GEN-2021-SR3GEN-2021-SR3Solar23.4 MWwithdrawnOklahoma City, Oklahoma
Foster 138kVGEN-2009-032SGas6.4 MWwithdrawnOklahoma City, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.