Generator Increase (802)

Generator Increase is a 2.1 MW other interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Connecticut Light and Powers 13.8 kv Forestville 12A Substation.

2.1 MWCapacity
WithdrawnStatus
CTMarket
OtherTechnology

Project facts

Canonical nameGenerator Increase
Queue ID802
Statuswithdrawn
Source statusW
MarketCT
TechnologyOther
Capacity2.1 MW
StateConnecticut
CountyHartford
Point of interconnectionConnecticut Light and Powers 13.8 kv Forestville 12A Substation
Requested (queue) date2018-12-04
Proposed in-service date2019-09-03
Operational date
Withdrawn date2019-08-06
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.