Geneva 115kV (X3-039)

Geneva 115kV is a 96.0 MW other interconnection project in Crawford, Pennsylvania with a current status of withdrawn.

96.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameGeneva 115kV
Queue IDX3-039
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity96.0 MW
StatePennsylvania
CountyCrawford
Point of interconnection
Requested (queue) date2011-08-31
Proposed in-service date2014-07-07
Operational date
Withdrawn date2013-06-19
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata