Georges River Energy (64408_WEG)

Georges River Energy is a 10.0 MW other interconnection project in Waldo, Maine with a current status of operational.

10.0 MWCapacity
OperationalStatus
ISNEMarket
OtherTechnology

Project facts

Canonical nameGeorges River Energy
Queue ID64408_WEG
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyOther
Capacity10.0 MW
StateMaine
CountyWaldo
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-12-01
Withdrawn date
Developer
Utility / transmission ownerRobbins Lumber Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata