Waldo County, Maine — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Waldo, Maine, representing 150 MW of requested capacity.

11Total projects
1Active
9Operational
0Withdrawn
150 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar7132 MW
Other313 MW
Wind14 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Three Corners Solar66955_18099Solar110.0 MWoperationalWaldo, Maine
Georges River Energy64408_WEGOther10.0 MWoperationalWaldo, Maine
Unity Solar65461_UNITYSolar5.0 MWoperationalWaldo, Maine
ME - EDF - Phase II - Belfast68905_BLFSTSolar5.0 MWoperationalWaldo, Maine
Perkins Road Belfast Solar, LLC67938_PERKSolar4.8 MWoperationalWaldo, Maine
Beaver Ridge Wind57130_BR1Wind4.5 MWoperationalWaldo, Maine
Searsmont Road Lincolnville Solar, LLC67940_SEARSSolar4.0 MWoperationalWaldo, Maine
Belfast PV, LLC70161_BLFSTSolar2.5 MWoperationalWaldo, Maine
Robbins Lumber50230_CATOther2.0 MWoperationalWaldo, Maine
Robbins Lumber50230_WESTOther1.2 MWsuspendedWaldo, Maine
Emery Shute Solar One65045_VCP14Solar1.0 MWactiveWaldo, Maine

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Waldo County.

Start tracking with interXdata