Georgia Power 24-SIC-002 (24-SIC-002)

Georgia Power 24-SIC-002 is a 160.0 MW solar interconnection project in Mitchell County, Georgia with a current status of active. It is proposed to connect at Scooter Substation 230 kV Bus.

160.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24-SIC-002
Queue ID24-SIC-002
Statusactive
Source statusSystem Impact Study
MarketGA
TechnologySolar
Capacity160.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionScooter Substation 230 kV Bus
Requested (queue) date2024-05-08
Proposed in-service date2027-05-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata