Georgia Power 24-SIC-003 (24-SIC-003)

Georgia Power 24-SIC-003 is a 117.5 MW solar interconnection project in Pierce County, Georgia with a current status of active. It is proposed to connect at Offerman Substation 230 kV Bus.

117.5 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24-SIC-003
Queue ID24-SIC-003
Statusactive
Source statusSystem Impact Study
MarketGA
TechnologySolar
Capacity117.5 MW
StateGeorgia
CountyPierce County
Point of interconnectionOfferman Substation 230 kV Bus
Requested (queue) date2024-07-26
Proposed in-service date2026-10-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata