Georgia Power 24-SIC-004 (24-SIC-004)
Georgia Power 24-SIC-004 is a 183.0 MW solar interconnection project in Baldwin County, Georgia with a current status of active. It is proposed to connect at Gordon - Milledgeville (White) 115 kV Line.
183.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power 24-SIC-004 |
|---|---|
| Queue ID | 24-SIC-004 |
| Status | active |
| Source status | System Impact Study |
| Market | GA |
| Technology | Solar |
| Capacity | 183.0 MW |
| State | Georgia |
| County | Baldwin County |
| Point of interconnection | Gordon - Milledgeville (White) 115 kV Line |
| Requested (queue) date | 2024-08-30 |
| Proposed in-service date | 2028-05-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata