Georgia Power 24-SIC-005 (24-SIC-005)

Georgia Power 24-SIC-005 is a 200.0 MW solar interconnection project in Twiggs County, Georgia with a current status of active. It is proposed to connect at Savage Creek Substation 230 kV Bus.

200.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24-SIC-005
Queue ID24-SIC-005
Statusactive
Source statusGIA with NTP
MarketGA
TechnologySolar
Capacity200.0 MW
StateGeorgia
CountyTwiggs County
Point of interconnectionSavage Creek Substation 230 kV Bus
Requested (queue) date2024-10-09
Proposed in-service date2027-03-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata