Georgia Power 24C-IC-1246 (24C-IC-1246)

Georgia Power 24C-IC-1246 is a 43.0 MW solar interconnection project in Liberty County, Georgia with a current status of active. It is proposed to connect at Fort Stewart CU 115 kV Bus.

43.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1246
Queue ID24C-IC-1246
Statusactive
Source statusGIA Draft
MarketGA
TechnologySolar
Capacity43.0 MW
StateGeorgia
CountyLiberty County
Point of interconnectionFort Stewart CU 115 kV Bus
Requested (queue) date2024-02-07
Proposed in-service date2027-02-12
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata