Georgia Power 24C-IC-1248 (24C-IC-1248)

Georgia Power 24C-IC-1248 is a 110.5 MW solar interconnection project in Treutlen County, Georgia with a current status of active. It is proposed to connect at Shaddock Creek - Vidalia 115 kV Line.

110.5 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1248
Queue ID24C-IC-1248
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologySolar
Capacity110.5 MW
StateGeorgia
CountyTreutlen County
Point of interconnectionShaddock Creek - Vidalia 115 kV Line
Requested (queue) date2024-03-11
Proposed in-service date2027-02-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata