Georgia Power 24C-IC-1249 (24C-IC-1249)

Georgia Power 24C-IC-1249 is a 140.4 MW solar interconnection project in Turner County, Georgia with a current status of active. It is proposed to connect at North Tifton - Pitts 230 kV Line.

140.4 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1249
Queue ID24C-IC-1249
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologySolar
Capacity140.4 MW
StateGeorgia
CountyTurner County
Point of interconnectionNorth Tifton - Pitts 230 kV Line
Requested (queue) date2024-03-11
Proposed in-service date2027-02-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.