Georgia Power 24C-IC-1255 is a 722.0 MW gas interconnection project in Bartow County, Georgia with a current status of active. It is proposed to connect at Valley Creek Drive Substation 230 kV Bus.
722.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology
Project facts
| Canonical name | Georgia Power 24C-IC-1255 |
|---|---|
| Queue ID | 24C-IC-1255 |
| Status | active |
| Source status | GIA with NTP |
| Market | GA |
| Technology | Gas |
| Capacity | 722.0 MW |
| State | Georgia |
| County | Bartow County |
| Point of interconnection | Valley Creek Drive Substation 230 kV Bus |
| Requested (queue) date | 2024-03-18 |
| Proposed in-service date | 2028-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata