Georgia Power 24C-IC-1258 (24C-IC-1258)

Georgia Power 24C-IC-1258 is a 722.0 MW gas interconnection project in Bartow County, Georgia with a current status of active. It is proposed to connect at Plant Bowen Substation 500 kV Bus.

722.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1258
Queue ID24C-IC-1258
Statusactive
Source statusGIA with NTP
MarketGA
TechnologyGas
Capacity722.0 MW
StateGeorgia
CountyBartow County
Point of interconnectionPlant Bowen Substation 500 kV Bus
Requested (queue) date2024-03-18
Proposed in-service date2029-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata