Georgia Power 24C-IC-1263 (24C-IC-1263)

Georgia Power 24C-IC-1263 is a 722.0 MW gas interconnection project in Heard County, Georgia with a current status of active. It is proposed to connect at Wansley Substation 500 kV Bus.

722.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1263
Queue ID24C-IC-1263
Statusactive
Source statusGIA with NTP
MarketGA
TechnologyGas
Capacity722.0 MW
StateGeorgia
CountyHeard County
Point of interconnectionWansley Substation 500 kV Bus
Requested (queue) date2024-03-18
Proposed in-service date2028-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.