Georgia Power 24C-IC-1267 (24C-IC-1267)

Georgia Power 24C-IC-1267 is a 57.5 MW battery interconnection project in Floyd County, Georgia with a current status of active. It is proposed to connect at Hammond SP Substation 230 kV Bus.

57.5 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1267
Queue ID24C-IC-1267
Statusactive
Source statusGIA with NTP
MarketGA
TechnologyBattery
Capacity57.5 MW
StateGeorgia
CountyFloyd County
Point of interconnectionHammond SP Substation 230 kV Bus
Requested (queue) date2024-03-22
Proposed in-service date2026-03-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata