Georgia Power 24C-IC-1279 is a 320.0 MW battery interconnection project in Coweta County, Georgia with a current status of active. It is proposed to connect at Yates Substation 230 kV Bus.

320.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 24C-IC-1279
Queue ID24C-IC-1279
Statusactive
Source statusGIA with NTP
MarketGA
TechnologyBattery
Capacity320.0 MW
StateGeorgia
CountyCoweta County
Point of interconnectionYates Substation 230 kV Bus
Requested (queue) date2024-04-03
Proposed in-service date2028-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata