Georgia Power 24S-IC-1187 (24S-IC-1187)

Georgia Power 24S-IC-1187 is a 220.0 MW battery interconnection project in Wilkinson County, Georgia with a current status of active. It is proposed to connect at Gordon Substation 115 kV Bus.

220.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 24S-IC-1187
Queue ID24S-IC-1187
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologyBattery
Capacity220.0 MW
StateGeorgia
CountyWilkinson County
Point of interconnectionGordon Substation 115 kV Bus
Requested (queue) date2023-10-26
Proposed in-service date2027-09-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata