Georgia Power 24S-IC-1195 (24S-IC-1195)

Georgia Power 24S-IC-1195 is a 200.0 MW solar interconnection project in Warren County, Georgia with a current status of active. It is proposed to connect at Sinclair Dam - Warrenton Primary 115 kV Line.

200.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24S-IC-1195
Queue ID24S-IC-1195
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologySolar
Capacity200.0 MW
StateGeorgia
CountyWarren County
Point of interconnectionSinclair Dam - Warrenton Primary 115 kV Line
Requested (queue) date2023-10-27
Proposed in-service date2028-08-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.