Georgia Power 24S-IC-1198 (24S-IC-1198)
Georgia Power 24S-IC-1198 is a 128.0 MW solar interconnection project in Houston County, Georgia with a current status of operational. It is proposed to connect at Robins AFB Solar Substation 115 kV Bus.
128.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power 24S-IC-1198 |
|---|---|
| Queue ID | 24S-IC-1198 |
| Status | operational |
| Source status | Commercial Operation |
| Market | GA |
| Technology | Solar |
| Capacity | 128.0 MW |
| State | Georgia |
| County | Houston County |
| Point of interconnection | Robins AFB Solar Substation 115 kV Bus |
| Requested (queue) date | 2023-10-31 |
| Proposed in-service date | 2025-10-24 |
| Operational date | 2025-10-24 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata