Georgia Power 24S-IC-1198 (24S-IC-1198)

Georgia Power 24S-IC-1198 is a 128.0 MW solar interconnection project in Houston County, Georgia with a current status of operational. It is proposed to connect at Robins AFB Solar Substation 115 kV Bus.

128.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24S-IC-1198
Queue ID24S-IC-1198
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity128.0 MW
StateGeorgia
CountyHouston County
Point of interconnectionRobins AFB Solar Substation 115 kV Bus
Requested (queue) date2023-10-31
Proposed in-service date2025-10-24
Operational date2025-10-24
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata